Case Study

You too have your project becomes a reality

Case Study Details

case study 1

Case Study 01.

9m Hybrid Patrol Vessel

CHV was responsible for:

  • Concept design
  • Hull design
  • Scantlings and structure design
  • CNC cut construction kit design
  • Stability assessment.

Case Study 02.

22m Windfarm Catamaran Vessel

CHV was responsible for:

  • The hull design for tow tank testing
  • Developable hull design
  • Scantling and structure design
  • Weight estimation
  • CNC hull and superstructure construction kit design
  • Local structure design and assessment (crane, anchor, etc.)
  • Intact and damage stability assessment.
case study 2
case study 3

Case Study 03.

80m Rock Barge Refit

CHV was responsible for:

  • Design of the new forward anchor system
  • Structural assessment of the accommodation containers foundations
  • Consulting on heavy deck equipment positioning in relation to underdeck structure and mooring and towing structure

Case Study 04.

25m Yacht Local Structure Assessment

CHV was responsible for:

  • FEA assessment.
case study 4